Berlin-Köpenick:
Track renewal Schlossplatz, Alt Köpenick

Disciplines

  • Railways

Companies

GRE German Rail Engineering GmbH

Construction Sum

approx. € 0.350 million

Client

Berlin public transport company (BVG)

Duration

From 2018 to 2020

Project Activities

Project planning traffic facilities according to § 47 HOAI 2013 Lph 2-5

Technical parameters:

Renewal of the tram tracks

Contact

GRE German Rail Engineering GmbH

Frankfurt (Headquarters)
Frankfurt Airport Center 1
Hugo-Eckener-Ring

D-60549 Frankfurt am Main
Deutschland

Phone: +49 30 24749-0
Fax: +49 30 24749-204
E-Mail: info@gre-rail.com

View in maps

Description

Berliner Verkehrsbetriebe is planning to renew the track system in the Schlossplatz/ Alt Köpenick area in the Berlin borough of Treptow-Köpenick due to the worn condition of the tracks and the unfavourable alignment of the curved tracks. The plans include the renewal of the track triangle on the listed Schlossplatz Köpenick with a challenging alignment in terms of position and height. In addition, three individual tracks with a total length of 380 metres and a switch are to be renewed. Müggelheimer Straße, which is located in the construction area, is subject to heavy traffic. 
Therefore, high demands are placed on the construction process and traffic management during the construction period.